Woodsville Interchange

Project Owner: Land Transport Authority, Singapore

The project includes the building of three underpasses and an overpass. Two of the underpasses have two lanes per direction each, stretching from Serangoon Road and Bendemeer Road to Upper Serangoon Road. The third underpass have one lane and stretch from MacPherson Road to Bendemeer Road

This project is one of the most complex construction as well due to the MRT tunnel beneath the interchange and the Deep Tunnel Sewerage System which runs parallel to the expressway. Several buildings will be affected by the road widening and the former Serangoon Fire Station will have to be torn down and modified become the new control centre and M&E equipment building for the interchange.

Ricky was the E&M team leader for the detailed design of Electrical and Mechanical Services for the project including Power supply and distribution system, tunnel lighting system, fire protection system deluge system, pumping and drainage system.